Commercial – Case Study

Case Studies, Commercial •

Commercial – Case Study


Project: Mechanical Tender Project for CPM Group Construction Services to provide a mechanical result in Building C at 88 Limestone Street, Ipswich.

Mechanical Design for Building C – Courtyard Tenancy.  Supply and installation of:

  • (1) x Daikin UAYQ210CY1A 67.23KW Reverse Cycle Three phase Package unit.
  • (1) x Daikin FBQ100 Low Profile 10.46kw Reverse Cycle One Phase Individual Ducted unit.
  • (1) x Daikin FCQ125 12.45kw Reverse Cycle one phase Cassette unit.
  • (1) x Sigrist ILCJ355-4E Square single Inline Centrifugal toilet Exhaust fan.
  • (1) x Sigrist HGM200 Mixed flow Inline toilet Exhaust fan.
  • (1) x Sigrist ILCJ450-4/6DDE Square cased Inline Centrifugal – 2 speed Kitchen hood supply fan.
  • (1) x Sigrist VCR-S560-6/8D Vertical discharge Centrifugal roof, Kitchen hood Exhaust fas.
  • (1) x Stoddart Kitchen hood CEH-VB 4200 x 1200 – 600
  • (1) x Stoddart Dishwasher hood STCON 1200 x 1100 – 450

Main level Tenancy’s – Supply and Installation of:

  • (1) x Daikin VRV 3 REYQ24PY1 Heat recovery Multi Ducted System.
  • (1) x Sigrist Turbo 200 USW1 Mixed flow Inline toilet Exhaust fan.
  • (1) x Sigrist ILCJ320-4E Square Single Inline Centrifugal outside air fan.

Upper Level Tenanacy’s – Supply and installation of:

  • (1)  x Daikin VRV 3 REYQ24PY1 Heat recovery Multi Ducted system.
  • (1) x Sigrist Turbo 200 USW1 Mixed flow Inline toilet Exhaust fan.
  • (1) x Sigrist Turbo 315 USW1 Mixed flow Inline outside air fan.

Total Project A/C Equipment Capacity: 206kw Total Cooling Capacity.